Vol. 58 No. 1
January 2006
The full-length paper discusses the discovery, development, and operation of a miscible-gas-cycling project in a highly undersaturated, volatile-oil Trias Argilo-Gréseux Inférieur (TAGI) reservoir in the center of the Berkine basin, Algeria. Miscible gas injection was initially considered to be high risk and marginally economic; however, with a flexible development plan and careful reservoir management, a successful project was implemented.
View a Synopsis of SPE 94138 published in JPT
For a limited time, the full-length paper is available free to SPE members. The paper has not been peer reviewed.
This article, written by Assistant Technology Editor Karen Bybee, contains
highlights of paper SPE 94138, "Successful Peripheral Miscible-Gas
Injection in RKF Field, Berkine Basin, Algeria - Field Case History," by H.
Cubillos, SPE, D. Stright, SPE, and J.M. Navarro, SPE, CEPSA, prepared for the
2005 SPE Europec/EAGE Annual Conference, Madrid, Spain, 13-16 June.
Purchase full paper from eLibrary