Vol. 58 No. 6
June 2006
The "design one, build two" strategy was used for recent West Africa deepwater developments including floating production, storage, and offloading vessels (FPSOs) for the large Kizomba A and B developments in Angola and smaller early-production-system projects such as those in Nigeria, Equatorial Guinea, and Angola. When properly managed, this strategy reduces project cycle time and cost.